It would be nice to have an option to display a total time for tasks in parenthesis in the Time Tracking view.
For example, if I have a work unit
'My Task' with 58min duration in the list,
it could have a) 'My Task' (16hrs) 58 min, or b) 'My Task' 58 min (16hrs)
WorkingHours version: Windows 2.7.5.0, Android 2.7.4
Operating system: Windows/Android
Thanks!