When I have an ongoing work unit, it sometimes happens that I switch to some small task and get back, and I don't want to stop the work unit and start a new one. At these times, I remember how much break time I should add to the unit and edit the unit when it is stopped. But logically, break time can be shown on ongoing items and it makes, and it will also show how much you have paused the work unit while it is going.
Another use case is that when a work unit is automatically paused (on Windows), I sometimes want to remove that break time (like when I am watching some tutorials). Currently it is only possible when it is stopped, and I have to remember to fix it when I stop it.
WorkingHours version: Windows 2.7.2.0 / Android 2.7.1
OS + version: Windows 10 21H1 (Build 19043.928) / Android 9, Havoc-OS 2.9