Stopping a work unit with desciption and start a new work unit within the same task but with a different description could be made faster by providing a shortcut or a small button next to the description. I think this can be quite handy since this feature could be used to switch between work units within the same project quite fast.
The current procedure to do that is to stop the work item and start a new one on the same task.
WorkingHours version: 2.6.18.0
Operating system: Windows 10