As a consultant, I would like to have the ability to assign a standard hourly rate to tasks via tags. As of today, assigning the hourly rate to each task or work unit has to be done individually. With the feature of automatically assigning the tag to each new work unit, it would be possible to assign a default hourly rate. Thus, separate tags could be created for different hourly rates, each with its own hourly rate. The hourly rate from the task should have priority over the hourly rate from the tag. Because the individual hourly rate defined at the Task level has priority over the general hourly rate defined at the Tag level.
If a Task or Work Unit has multiple Tags assigned with different default hourly rates, this should either be detected and not be possible in the first place, or the other option would be to give priority to the higher hourly rate.
Windows Desktop Applikation, version 2.9.33.0